![]() ![]() You can create a report which is ugly or you can export the results to a txt file and open it in excel to better customize to the liking of the bureaucrats. If you want the data then click the results tab. You can select as many pipes as you want and see the HGL which is in default red or you can customize. If I want to quickly see the HGL to see if the design is Ok then I go to the profile button. When you get the following window, I usually do not use it to interpret the data as the GUI is not good. For starting HGLs i usually put it on the crown unless I know the starting HGL. Under Calculation Options leave the first button clicked. Under hydrology, because you manually inputed the Qs select Known Qs only. User’s Information Manual Series 100 Models: SHPM-270 - SHPM- 540 - SHPM-810 - SHPM-1080 - SHPM-1350 - SHPM-1620 - SHPM-1890 - SHPM-2160 Modular Water Source Commercial Heat Pump Water Heating Systems Certified UL 1995:2015 CSA C22.2 NO. Press ok.Īssuming everything was filled out correctly click the run button.Ī "Compute System" window appears. The team used physics-based simulations to create a multiscale modeling and simulation methodology to aid in developing and optimizing an SHPM system for wind-turbine blades. If you have on-grade inlets you need to fillout more information. That way I can skip steps and meet production. A 1.5 HP up rated pump (SHPM) will use about 7 amps 230 V where the full rated pump (SHPF) will use a little over 10 amps 230v. Another check is the full load amps if it is on the label. As, I said before I grade for on-sag inlets. The 1.5 HP SHPM fits the data that you have much better so I suspect, the pump was mislabled somehow. Go to the Inlet/Junction tab and fill out the relevant information. If you do not and move from tab to tab it will clear the data.Īfter you fill out the pipe tab and press ok. Then I manually enter this Q for each structure in storm sewers. With that said I manually calculate the Q per basin. And lets admit the GC, the city, even engineers really do not care. Jandy Stealth High Pressure Up-Rate Two-Speed Pool Pump 2.5HP 230V SHPM2.5-2 Parts Back to Product 1 Jandy Stealth Series 2-Speed Motor 2.5HP R0479309 Quantity: 804.20 1 Replacement Square Flange Pool & Spa 2-Speed Motor 2HP Full-Rated/2.5HP Up-Rated 56-Frame Energy Efficient 230V B2984 ASB2984 Quantity: 469. This is generally easier tha on-grade inlets that way I do not really have to account for by passing, especially if it is a very small site. Now when I grade my surface for the development, I grade in such a way as to make low points which act as the inlet. Format the Results Table from the HGL Plot to see the data better. Click on the Report Command to Show the HGL Data in Tabular Format Step 3. Load the Domain in the HGL Plot using Report Manager Step 2. stm to import into storm sewers using the exportstormsewerdata command.Īssuming you have exported your data and imported into stormsewers you should get something like this: The report feature of the HGL plot helps you understand in more detail the pump flows, forcemain flows and node heads. Using pipenetworks enables me to easily export the. I usually, do all my storm infrastructure using pipenetworks and the Quuxpipelevation editor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |